How to fix the frame of modern hinged bi-folding shower room?
The modern hinged bi-folding shower room is an independent and comfortable bathing environment as well as a completely exclusive bathing space. After you purchase a modern hinged bi-folding shower room that you love, how to fix the frame during installation? The following shower room manufacturers come to analyze it for everyone.
The installation of a modern hinged bi-folding shower room is first to find a place, punch holes, and then fix the frame. More tools are needed for position finding and punching, and the operation is more complicated.
One: Determine the drilling position, use tape measure + pen
The shower room must be fixed. The fixing method is generally to use screws to leave the holes on the aluminum alloy frame on the wall. All that needs to be done is to mark the corresponding position on the wall. The method is to put the frame on the wall, make sure the position is correct with a tape measure, and then mark the wall with a pencil.
2: Punch holes, use percussion drills
After setting the position, the next step is to punch. Punching is also divided into two steps. First, use a circular percussion drill to make a shallower hole at the marked location on the wall; construction tips: the bathroom wall has been covered with bricks, which is relatively hard. In order to make drilling easier, you can wet the drill bit. In addition, you can pour some water while drilling; after drilling the prototype mark hole, the next step is to use a spiral with stronger impact. The drill is out. On the basis of the shallower holes that have been punched, make a deeper hole.
Three: Install rubber pellets, use a hand hammer
Before screwing the screws into the wall, you need to install the expansion rubber particles in the holes first. The rubber particles can better tighten the screws. Use a hand hammer to knock the rubber particles into the drilled hole.
4: Fix the frame, use an electric screwdriver
After the above steps are completed, you can install the shower room frame, put the bottom frame on the water retaining strip, and then fix the frame. The method is to use an electric screwdriver to drive the screws into the wall to fix the frame.
评论
发表评论